Grinding knives does not harm the woodcutter. The inspection and preparation work before starting the diesel engine driven screw machine can timely detect potential faults in the machine equipment, avoid serious faults, and reduce the failure rate. Below are tips on the items that need to be inspected before starting the diesel driven screw machine
Practicing good knife sharpening doesn't delay the chopping work. The inspection and preparation before starting a diesel engine-driven screw machine can promptly identify potential faults in the machinery and equipment, effectively preventing serious failures and reducing the failure rate. Here are the items that need to be checked before starting a diesel engine-driven screw machine:
The screw machine should be placed on a flat and upwind location. Especially in mining areas or construction sites, the screw machine should be positioned in a place with less dust as much as possible, and the tires must be securely fixed to prevent it from moving.
Check the oil for the screw, the diesel engine oil, the antifreeze, to ensure they are sufficient and not discolored or deteriorated; check if the air filter element and the pipelines are damaged or leaking; check if the screws at key parts are tightened.
During use, it is necessary to regularly check the operating time of the equipment. If the maintenance time is reached, maintenance should be carried out promptly (the method to check the operating time is to power on the device, press the modification timing button, and the digital display will show H-XX XXXX; the X at the end represents the running time number.)
Check whether there is water in the oil and gas tanks, especially in areas with high air humidity, and do this inspection every day. The method for draining water is to slightly open the oil and gas tank's oil discharge valve, and by feeling with your hand, if the flowing liquid is relatively smooth, immediately close the valve. It should be noted that before draining the water, the machine head must be left to stand for more than 6-8 hours; otherwise, the discharged liquid will be a mixture of oil and water.
If the new machine or screw machine has not been used for a long time, before starting it, you need to add more than 2 liters of screw oil to the machine head of the screw machine to prevent the machine head from being damaged due to lack of oil. Remove the air intake valve on the intake valve, open the intake valve, and add Zhigao's special screw oil.
The maintenance intervals vary depending on the usage environment. In environments with a lot of dust and high humidity, the maintenance period should be shortened accordingly.
1. Key items for the first maintenance and regular maintenance: Replacement of oil filter and screw oil;
II. Main items of major maintenance: Replacement of oil filter, screw oil, oil separator core, etc.
III. The air filter element is a mandatory inspection item for each shift. It should be blown clean from the inside out using low-pressure air. Any damage found should be replaced immediately.
Four, different brands, different viscosities and different types of screw oil must not be mixed.
To learn more about the
ZhaoGao screw air compressor, please follow us at Hunan Ruiseng Mechanical Equipment Co., Ltd.
Related information:
What are the installation steps for the subsoil drilling vehicle unit?
Integrated Drilling Rig: Introduction to ZGYX-460 Integrated Drilling Rig
The fog cannon manufacturers seize the market hotspots
ZhiGao Screw Air Compressor: Reasons for the Inability to Open the Air Intake Valve of the Screw Air Compressor and Solutions
ZhiGao screw air compressor: What is the submersible drilling vehicle? Is it related to the integrated drilling rig?