The operation technology of water well drilling rigs must be cautious. In order to avoid accidents during operation, the following editor will introduce the precautions for construction operation of Hunan water well drilling rigs, hoping to help everyone.
Hunan Water Well Drilling Machine, hoping to be helpful to everyone.
A water well drilling machine operator must master the operation techniques of the drilling machine, as well as comprehensive maintenance and care knowledge, and possess considerable experience and methods for troubleshooting.
When transporting water well drilling equipment, safety inspections must be conducted. All components of the drilling machine must be complete, the cables must have no leakage, and there should be no damage such as broken drill pipes or drill tools. When entering the construction site, the drilling tower of the drilling machine must be securely fixed. The area of the drilling site should be larger than the base of the drilling machine, and there should be sufficient safety space around.
When using clean water for drilling, water supply is not allowed before the start of drilling. Water can be supplied for pressure drilling only after it returns. Ensure there is sufficient flow rate. Maintenance of water well drilling machines in Hunan. Do not drill dry holes. When there is a lot of rock powder in the hole, increase the water volume and prolong the pump start time. Ensure the hole is thoroughly flushed after drilling.
The drilling can be stopped now.
During the drilling process, it is necessary to accurately measure the distance. For the maintenance of water well drilling rigs in Hunan, every time 10 meters are drilled or the drill bit is replaced, the drill pipe must be measured to verify the depth of the hole. Check for any overheating phenomena in the gearbox, shaft sleeves, horizontal shaft gears, etc., and for any abnormal sounds. If any problems are found, the machine should be immediately stopped and the cause investigated.
The reason is that it must be dealt with promptly. Don't delay until problems arise and then try to avoid them. Doing so will lead to even greater problems.